Project Description
Client: Northern Ireland Water
Main Contractor: Dawson Wam Ltd
Installation Method: Directional Drilling
Brief Job Description
Installation of 500mm rising main through forested area. The installation consisted of 3 drills, 110m, 90m and 50m.
The ground was very hard and dry due to trees and was difficult to drill. An extra back reaming pass was added to assist in creating the bore required for the pipe. This ensured that the pipe was installed correctly and the client was very happy with the results.